2011 Projects – Roof(s) Day 2

The garage side access door was put in, Garage shingles done – they still need to replace the siding.  Front side of house has the shingles removed:

Note it is so hot, when I took the camera outside, it fogged up!

2 thoughts on “2011 Projects – Roof(s) Day 2”

  1. Looking good, Doug. I like the idea of the side-door access into your garage from the backyard. You will use that a lot. Must be really Hot there, especially with the humidity figured in.

  2. Yes, the side access door was badly needed. If my automatic garage door opener failed, then I would have to go in through a side-window to open the garage. Now that I will be insulating the garage and have the window mounted in there appropriately, going in through the window is not an option! I had them make it an open-out door, so if I have stuff in front of it in the garage, I can still get it!

    I got home and my thermometer said 100 degrees without the humidity figured in! Yes it is hot!