Mar 31, 2014 Update

Receive my transmission tunnel patch to use as a template for where to place the patch… I lined up the body lines in the floor…
image

Had to remove the brace…
image
image

 

Placed it to line up where it needed to go.image
image

Made some reference lines and took some key measurements…  Ignoring the outside black line…
image
image image
image

 

Need to clean the edges and put some weld-through primer on then decide on welding or using some body adhesive…

Leave a Reply

Your email address will not be published. Required fields are marked *

Time limit is exhausted. Please reload the CAPTCHA.