3-11-2017 – 4-speed shifter hump

Doing some final confirmation of my measurements before cutting the hole tomorrow.  I think I am as ready as I can be…  Won’t be doing the transmission until 2019 and want the floor to be done before that.  The goal for 2017 is to have the bottom of the car complete so I can work on the suspension next year – I attached the console to all of the mounting points and looks to be spot-on:

Tomorrow I will be cutting this out – I will be using 3M bonding adhesive soon along with the rivets to ensure I can get the placement I want.