5-27-2017 – 4-speed shifter hump

Spent some time in the garage today.  Bonding the patch and 4-speed shifter hump.

I spent as much time preparing as I did working on these.  The patch took about an hour and the shifter hump about 30 minutes.  Some of the rivet holes needed a drill touch-up to widen,  Hopefully back at it tomorrow!  The 3M bonding says you have a 90-120 minute window to work with it and about a 24 hour cure time.  I will still go over it with some seam sealer on both sides although it says you don’t need to – better safe than sorry!

Leave a Reply

Your email address will not be published. Required fields are marked *

Time limit is exhausted. Please reload the CAPTCHA.