{"id":721,"date":"2012-10-17T17:23:53","date_gmt":"2012-10-17T22:23:53","guid":{"rendered":"http:\/\/dougbratton.info\/blog\/?p=721"},"modified":"2012-10-17T17:25:45","modified_gmt":"2012-10-17T22:25:45","slug":"oct-17-2012-jig-update","status":"publish","type":"post","link":"https:\/\/dougbratton.info\/blog\/2012\/10\/oct-17-2012-jig-update\/","title":{"rendered":"Oct 17, 2012 Jig Update"},"content":{"rendered":"<p>Been busy prepping and painting the body jig. \u00a0First, I sanded off the weld-thru primer that was left over, then cleaned the metal with Eastwood Metal Wash, then used Prep Step and finally painted with 2 coats of Zero-Rust.<\/p>\n<p>Here are the two 11&#8242; pieces of 2&#215;2:<\/p>\n<p><a href=\"https:\/\/dougbratton.info\/blog\/wp-content\/uploads\/2012\/10\/P1010006.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-726\" title=\"2 11' pieces\" src=\"https:\/\/dougbratton.info\/blog\/wp-content\/uploads\/2012\/10\/P1010006.jpg\" alt=\"\" width=\"757\" height=\"568\" srcset=\"https:\/\/dougbratton.info\/blog\/wp-content\/uploads\/2012\/10\/P1010006.jpg 757w, https:\/\/dougbratton.info\/blog\/wp-content\/uploads\/2012\/10\/P1010006-300x225.jpg 300w, https:\/\/dougbratton.info\/blog\/wp-content\/uploads\/2012\/10\/P1010006-399x300.jpg 399w\" sizes=\"auto, (max-width: 757px) 100vw, 757px\" \/><\/a><\/p>\n<p>Here are the T pieces of 18&#8243; 2&#215;2 welded to 6&#8243; 2.5&#215;2.5 pieces:<\/p>\n<p><a href=\"https:\/\/dougbratton.info\/blog\/wp-content\/uploads\/2012\/10\/P1010009.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-727\" title=\"T pieces\" src=\"https:\/\/dougbratton.info\/blog\/wp-content\/uploads\/2012\/10\/P1010009.jpg\" alt=\"\" width=\"757\" height=\"568\" srcset=\"https:\/\/dougbratton.info\/blog\/wp-content\/uploads\/2012\/10\/P1010009.jpg 757w, https:\/\/dougbratton.info\/blog\/wp-content\/uploads\/2012\/10\/P1010009-300x225.jpg 300w, https:\/\/dougbratton.info\/blog\/wp-content\/uploads\/2012\/10\/P1010009-399x300.jpg 399w\" sizes=\"auto, (max-width: 757px) 100vw, 757px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/dougbratton.info\/blog\/wp-content\/uploads\/2012\/10\/P1010010.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-728\" title=\"T pieces\" src=\"https:\/\/dougbratton.info\/blog\/wp-content\/uploads\/2012\/10\/P1010010.jpg\" alt=\"\" width=\"757\" height=\"568\" srcset=\"https:\/\/dougbratton.info\/blog\/wp-content\/uploads\/2012\/10\/P1010010.jpg 757w, https:\/\/dougbratton.info\/blog\/wp-content\/uploads\/2012\/10\/P1010010-300x225.jpg 300w, https:\/\/dougbratton.info\/blog\/wp-content\/uploads\/2012\/10\/P1010010-399x300.jpg 399w\" sizes=\"auto, (max-width: 757px) 100vw, 757px\" \/><\/a><\/p>\n<p>Here are the 2 6&#8242; pieces of 2&#215;2<\/p>\n<p><a href=\"https:\/\/dougbratton.info\/blog\/wp-content\/uploads\/2012\/10\/P1010041.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-729\" title=\"6' Pieces\" src=\"https:\/\/dougbratton.info\/blog\/wp-content\/uploads\/2012\/10\/P1010041.jpg\" alt=\"\" width=\"757\" height=\"568\" srcset=\"https:\/\/dougbratton.info\/blog\/wp-content\/uploads\/2012\/10\/P1010041.jpg 757w, https:\/\/dougbratton.info\/blog\/wp-content\/uploads\/2012\/10\/P1010041-300x225.jpg 300w, https:\/\/dougbratton.info\/blog\/wp-content\/uploads\/2012\/10\/P1010041-399x300.jpg 399w\" sizes=\"auto, (max-width: 757px) 100vw, 757px\" \/><\/a><\/p>\n<p>I still have more pieces to clean and prep for painting, but needed to order more Zero-Rust and will need to wait for that to arrive to finish painting the parts of the Jig.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Been busy prepping and painting the body jig. \u00a0First, I sanded off the weld-thru primer that was left over, then cleaned the metal with Eastwood Metal Wash, then used Prep Step and finally painted with 2 coats of Zero-Rust. Here are the two 11&#8242; pieces of 2&#215;2: Here are the T pieces of 18&#8243; 2&#215;2 &hellip; <a href=\"https:\/\/dougbratton.info\/blog\/2012\/10\/oct-17-2012-jig-update\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Oct 17, 2012 Jig Update<\/span> <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[3],"tags":[14],"class_list":["post-721","post","type-post","status-publish","format-standard","hentry","category-camaro","tag-body-jig"],"_links":{"self":[{"href":"https:\/\/dougbratton.info\/blog\/wp-json\/wp\/v2\/posts\/721","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dougbratton.info\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dougbratton.info\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dougbratton.info\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dougbratton.info\/blog\/wp-json\/wp\/v2\/comments?post=721"}],"version-history":[{"count":6,"href":"https:\/\/dougbratton.info\/blog\/wp-json\/wp\/v2\/posts\/721\/revisions"}],"predecessor-version":[{"id":735,"href":"https:\/\/dougbratton.info\/blog\/wp-json\/wp\/v2\/posts\/721\/revisions\/735"}],"wp:attachment":[{"href":"https:\/\/dougbratton.info\/blog\/wp-json\/wp\/v2\/media?parent=721"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dougbratton.info\/blog\/wp-json\/wp\/v2\/categories?post=721"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dougbratton.info\/blog\/wp-json\/wp\/v2\/tags?post=721"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}