Not a whole lot to report for this weekend. I did apply some POR-Patch to some screw-sized holes in the floor pan after prepping the metal with Metal-Ready. I really didn’t want to take the time to attempt to weld these up. I will be using U-Pol Raptor bedliner on the floor anyhow, so this will be covered up.