Got a lot done on the shed today. Still need to get the doors, shingles, window and trim installed…
Daily Archives: June 3, 2012
Shed & Front Deck – Sat Jun 2
Got all of the posts measured, dug, and in-place… After the two of us using a post-hole digger on one hold each for about an hour, we rented an auger to do all of the rest in the same amount of time!
For the shed, here are the 8×8’s leveled out for the floating skid foundation:
Floor:
Used tongue-in-groove boards.